Water Management Improvement Project
SL no.Contact Package No.Name/ description of the workContact Value (লাখ)Starting Date

Completion

Date

01(Package No. BWDB:FDR/ Cox’s Bazar/ W-1.Rehabilitation of embankment in CEP Polder No. 71 by Re-construction of embankment with slope protection from km. 25.900 – 27.000 = 1.100 km in Upazilla- Kutubdia and Dist. Cox’s Bazar under Cox`s Bazar O&M Division, BWDB, Cox`s Bazar, during the year 2010-11.1632.9524/04/1231-03-2012
02 Package No. – BWDB:FDR/Cox’s Bazar/ W-2Rehabilitation of embankment in CEP Polder No-71 by Re-Construction of embankment with slope protection (Sea-dyke) from km. 27.000 to 28.100=1.100 km in Upazilla- Kutubdia and Dist. Cox’s Bazar under Cox`s Bazar O&M Division, BWDB, Cox`s Bazar, during the year 2009-10 and 2010-2011.1569.8129/06/12

31-03-2012

03Package No. BWDB:FDR/ Cox’s Bazar/ W-3Rehabilitation of embankment in CEP Polder No. 71 by Re-construction of embankment with slope protection from km. 28.100 – 29.200 = 1.100km. in Upazilla- Kutubdia and Dist. Cox’s Bazar under Cox`s Bazar O&M Division, BWDB, Cox`s Bazar, during the year 2010-11.1207.1629/06/1230-04-2012
04Package No. – BWDB:FDR/Cox’s Bazar/ W-4Rehabilitation of Embankment in CEP polder  67 (Nhila) in upazilla-Teknaf by (a) Reconstructing enbankment = 6.040km (F) and (b) Constructing bank revetment =1.690km (F) on the right bank of the Naf river in District Cox’s Bazar in connection with FDR-2007 works under WMIP during FY 2009-10 and 2010-2011.457.0630-04-201230-04-2012
05(Tender No: 05/2011-12, Package No: BWDB:FDR/ Cox’s Bazar/ W-04A)Rehabilitation of embankment in CEP Polder No 67(Nhilla):  (a) Construction of bank protection work from km. 2.950 to km. km. 3.250= 0.300 km (F) and (b) Construction of inlet structures= 2 Nos. (F) at km. 2.960 and km. 3.240 on the right bank of Naf River during the F.Y. 2011-2012 & 2012-2013.465.7224/04/1220/04/13
06(Tender No: 05/2011-12, Package No: BWDB: FDR/ Cox’s Bazar/ W-05)Rehabilitation of embankment in CEP Polder No. 71:  (A) Re-construction of embankment with slope protection from km. 12.900 to km. 13.500 (Sea-dyke at Kaiserpara), km. 33.430 to km. 33.580 (Interior dyke at Jelepara)=0.750 km. and (B) Breach closing & re-sectioning of embankment: total length 8.715 km between km. 0.000 to. 35.500 during the FY  2011-2012 & 2012-2013.1417.1929/06/1225/05/13
07Package No: BWDB:FDR/ Cox’s Bazar/ W-06)Rehabilitation of embankment in CEP Polder No. 66/2:  (A) Re-construction of embankment: total length 1.510 km. between km. 2.000 to km. 10.500; (B) Slope protection of embankment: total length 0.660 km. between km 1.500 km. to km. 10.500; (C) Re-sectioning of embankment: total length 9.190 km. between km. 0.000 to km. 16.500 and (D) Rehabilitation of 15 nos. Regulator during the FY 2011-2012 & 2012-2013. (Tender No: 05/2011-12,1110.4229/06/1225/05/13
08Package No : BWDB:FDR/Cox’s Bazar/W-3A.)Rehabilitation of embankment in CEP Polder No. 71 by Re-Construction of embankment with slope protection (Sea-dyke) from km. 28.100-29.200=1.100 km in c/w Flood Damage Rehabilition-2007 works including relevant additional works beyond original contract under Cox's Bazar O&M Division, BWDB, Cox's Bazar during the FY 2012-2013. (For Tender no: 03/2012-13,1678.3115/01/1328/12/13

 

মাতামুহুরী সেচ প্রকল্প(২য় পর্যায়)
SL No.Work description & PackageContact Value(লাখ)Starting date Completion date
01Construction of Rubber Dam including foot bridge, Pump house, supply & installation of Rubber Bag & other ancillary works over Manikchari River at Bagguzara, Upa-zilla :- Chakaria & Pekua, in Cox`s Bazar District in c/w “Matamuhuri Irrigation Project, 2nd Phase” under Cox`s Bazar O&M Division, BWDB, Cox`s Bazar during the year 2008-09 & 2009-2010.3101.1401/04/0931/05/13
Reju river & river training work of adjacent area and Agriculture development due to climate change
Sl No.Package No.Work descriptionContact Value(লাখ)Starting date Completion date
01 Package No : W-54- COXD-CCTF- 05/ 2011-12).River training work of Raju river down stream of Sahid Zafar bridge km. 0.000 to km. 0.380 (R/B) & km. 2.000 to km. 2.300= Total 0.680km. under reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2011-12 (For Tender no: 11/2011-12,418.3417/12/1230/04/13
02Package No : W-55- COXD-CCTF- 06/ 2011-12).Protective work of Bakkhali river Dawanpara 45m Rajarkul Sikdarpara 45m, Chakmarkul R/B & L/B (Mistoripara-Mithachori) 215m, total= 0.305km. under reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2011-12. (For Tender no: 11/2011-12,320.8417/12/1230/04/13
03Package No : W-56- COXD-CCTF- 07/ 2011-12).Protective work at Left bank of Reju river near of Sahid Zafar bridge for a length of km. 0.000 to km. 0.107 = 0.107m under Reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2011-12 & 2012-13. (For Tender no: 12/2011-12,80.1617/12/1230/04/13
04(Package No : W-05- COXD-CCTF- 08/2012-2013).Protective work at the Right bank of Bakkhali river at Mokterkul, Ulubonia under reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2012-13.170.9317/12/1230/04/13
05(Package No : W-01- COXD-CCTF- 01/ 2012-2013).Re-excavation of khal for a length 4.850km. (Chinda to Rajarkul) under reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2012-1340.5017/12/1230/04/13
06( Package No : W-02- COXD-CCTF- 02/ 2012-2013).Re-excavation of khal for a length 3.150km. (Rajarkul to Samidhapa) under reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2012-13.52.4217/12/1230/04/13
07Package No : W-03- COXD-CCTF- 03/2012-2013).Re-sectioning of embankment for length 5.00km. left bank of Bakkhali river and Construction of 4nos spar under reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2012-13.(98.6617/12/1230/04/13
08 (Package No : W-04-COXD-CCTF- 04/2012-2013).Re-sectioning of embankment for  length 6.00km. right bank of Bakkhali river under reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2012-13.99.2917/12/1230/04/13
09(Package No : W-06- COXD-CCTF- 09/ 2012-2013)Protective work at the left bank of Bakkhali river at Monirjhil-0.040km., Sikolghat- 0.030km. and right bank of Bakkhali river at Lamboripara- 0.090km, total 0.160km. at the right bank of Bakkhali river at Lambori Para under reju river & river training work of adjacent area and Agriculture development due to climate change in c/w “Climate Change Trust Fund” during the year 2012-13.194.0917/12/1230/04/13
Rehabilitation of Polder No.- 66/1
Sl No.Package No.Work descriptionContact Value (লাখ)Starting dateCompletion date
01 (W-07- COXD-CCTF- 10/ 2012-2013).Rehabilitation of embankment 6.500km, Regulator 3 nos. and Construction of Spur 7nos, Intel-2 nos under Rising & Rehabilitation of embankment in CEP Polder No. 66/1 and Bank Protective work of Bakkhali river under Water Resources Sector due to Climate Change in c/w “Climate Change Trust Fund” in upazilla & District- Cox’s Bazar under Cox's Bazar O&M Division, BWDB, Cox's Bazar during the year 2012-2013.274.1117/12/1230/04/13
02Package No : W-10-COXD-CCTF-12/2012-13).Construction of Inlet at Madertoly in polder No No.- 66/1 under Rehabilitation of Polder No.- 66/1 in PM Khali union in Upazilla-Cox's Bazar, District- Cox's Bazar in c/w "Climate Change Trust Fund (CCTF)" Under Cox's Bazar O&M Division, BWDB, Cox's Bazar during the year 2012-2013. (For Tender no: 10/2012-13,65.5517/12/1230/06/13

 

Infrastructure development/Rehabilitation project for Risk mitigation due to Climate Change affect in Coastal area of South-Eastern Zone of Bangladesh.
SL. No.Package No.Work descriptionContact Value(লাখ)Starting dateCompletion date
01 (Package No.- W-08- COXD-CCTF- 11/ 2012-2013).Construction of Embankment with Protective work along the left bank of Matamuhuri river at Puruttakhali Bazar from km. 5.320 to km. 5.580= 0.260km in Polder No-65 in Upazilla- Chakaria and from 1.645 to km 1.696 = 0.051km in polder no-66/1 at Kuruskulin in Upazilla-Cox's Bazar, District- Cox's Bazar in c/w "Climate Change Trust Fund (CCTF)" Under Cox's Bazar O&M Division, BWDB, Cox's Bazar during the year 2012-2013.298.0020/01/1330/06/13
নদী সংরক্ষণ উন্নয়ন ও শহর রক্ষা প্রকল্প (৪র্থ পর্যায়)
Sl. No.Package No.Work descriptionContact Value(লাখ)Strarting dateCompletion date
01 (Package No: W04-COXD-TP (4th Phase) – 01/2011-2012) Under Cox’s Bazar O&M Division, BWDB, Cox’s Bazar during year 2010-2011.Protective work of bank erosion at Matarbari Channel from km. 27.250 to km. 27.664 = 0.414 km in Polder No-70, at Matarbari Rajghat Upazilla- Moheshkhali in c/w “River Protection Development and Town Protection Project (4th Phase)” for tender No: 11/2010-2011382.6512/02/1231/05/13
02(Package No: W05-COXD-TP (4th Phase) – 02/2011-2012) Under Cox’s Bazar O&M Division, BWDB, Cox’s Bazar during year 2010-2011.Protective work of bank erosion at Matamuhuri River from km. 73.275 to km. 73.475 = 0.200 km at South Mehernama & km. 88.490 to 88.6305 = 0.1405 km. at Rupalibazar, Total = 0.3405 km. at Upazilla- Pekua, in Polder No- 64/2B. in c/w “River Protection Development and Town Protection Project (4th Phase)” for tender No: 11/2010-2011272.4023/02/1231/12/12